Street Division

The Colleyville street division
, performs routine street and drainage maintenance tasks. This division
, responds to emergencies and weather related events as needed to ensure safe conditions for residents.
Objectives
- Perform routine street maintenance activities
- Repair reported potholes expeditiously
- Inspect and repair storm inlets twice annually
- Clear debris from low water crossings and reopen roads as soon as practical
Hours of Operation
Normal hours are from 7:30 a.m. to 4:30 p.m. Monday through Friday. However, standby personnel are available seven days a week, 24 hours a day.
Reporting problems
To report any problem during normal working hours for streets, drainage, water, or sewer, call the
Colleyville Public Works Division at 817.540.0609 or to submit an online request.
For after hour emergencies, contact the Colleyville Police Department at 817.281.3132 and the request will be forwarded to our standby personnel.
Specific Projects Resurfacing projects are accomplished by contract as needed and approved during the budgeting process. Crack sealing is accomplished by Street
Division.Street reconstruction projects are routed through the Engineering
Division, for study and design. Projects are prioritized for city council approval and funding. Street reconstruction is the removal of an existing street, complete replacement of the infrastructure (storm drains, pipes, culverts, curb, gutter, water, sewer, gas, etc.) as needed, re-grading of the sub-surface, stabilizing the sub-grade, and applying a new surface of either concrete or asphalt.
Potholes
A pothole crew is scheduled every workday that weather permits and materials are available from the asphalt plants. During rains, a temporary patch is applied and the final patch is made as soon as the work can be scheduled and weather permits.