1601 Hall-Johnson Road Colleyville, Texas 76034 Phone: 817.540.0609 Fax: 817.354.0469 Staff Listing | | |
 Colleyville’s water conservation measures will take effect May 1 and continue through October. These measures include: | | |
General FAQ Utility Operations Division |
 The Utility Operations Division ensures that adequate supplies of clean, safe drinking water are provided throughout the year, and that the wastewater collection system operates at optimum capacity. Utility Operations FAQ View the 2010 Annual Water Quality Report
The Drainage Department maintains water quality in Colleyville by inspections, sampling and testing. The department is responsible for all maintenance on Colleyville's drainage system, including ditch maintenance, low-water water crossings, street sweeping, and the mowing of right-of-ways. Drainage Division FAQ |
|
| Street Capital Improvement Program |
| Road quality has an impact on every Colleyville resident, business, and visitor-affecting property values; business, school, and residential accessibility; and the quality of life of our citizens. The Street Capital Improvement Program (CIP) encompasses projects that maintain or improve Colleyville's roadway infrastructure. With a population that has increased by more than 50 percent since the early 1990s, it is imperative that the city maintain and build its street infrastructure to meet the demands of a growing residential and commercial population. | The Engineering Division provides excellence in the guidance and direction of all planning, design, and construction of capital and development projects in the city of Colleyville while maintaining a commitment to professionalism and cost effective customer service. We strive to create an environment that encourages development and protects community interests. Engineering Division Overview Lot Grading Permit Grading Permits
|

|