| Church Street Realignment |
|
Project Description – Church Street will be re-aligned to allow traffic movement from the existing east side of SH26 to Pleasant Run Road. The scheduled improvements will consist of a concrete roadway throughout the length of the project and construction of a cul-de-sac on the south end of Hidden Oaks Drive. This work also requires modifications to the existing traffic signals at the intersection of Church Street and SH 26, as well as replacement and extension of existing water, sanitary sewer and drainage systems. In order to follow the Master Trails Plan, a 10’ wide trail will also be constructed along the route of the new Church Street improvements.Contact the Engineering Dept at 817-503-1090 for further information |