| Tara Plantation Subdivision - Part I |
|
Project Description Removal and replacement of a full-depth asphalt surface and sub-grade preparation. Streets included in this project are: Butler Court Copperwood Court Crest Court Crest Drive Fairhill Court Plantation Court Plantation Drive North Plantation Drive South Tara Drive Trail Bend Court Street Condition Rating: D Random base and sub-grade failures are evident in both concrete and asphalt streets. The existing roadway has extensive surface patches due to weather main breaks, franchise utility repair of existing facilities and prior construction improvements. Random drainage issues are identified, including surface ponding, inadequate street grades or damage to existing drainage facilities. Repair of existing surface failures and placement of an asphalt level up and overlay over concrete and asphalt streets is necessary to extend service life of the street. Crest Court Crest Drive Fairhill Court Trail Bend Court Street Condition Rating: F Existing concrete and asphalt pavements experience extensive base and sub-grade failures throughout the length of the roadway. Street can no longer maintain proper drainage due to pavement heaving or failure. Existing underground utilities have deteriorated to the point that replacement is required to maintain service life. Total street reconstruction is necessary. Butler Court Copper Wood Court Plantation Court Plantation Drive North Plantation Drive South Tara Drive Estimated Project Costs Butler Court: $64,200 Copper Wood Court: $57,780 Crest Court: $48,150 Crest Drive: $129,000 Fairhill Court: $30,600 Plantation Court: $48,150 Plantation Drive North: $173,340 Plantation Drive South: $335,659 Tara Drive: $64,200 Trail Bend Court: $40,981 Project Schedule TBD Funding Source(s) TBD Project Status Recommended by citizen CIP committee. Pending approval of council and identification of funding source. |