| Church Street |
|
Project Description Church Street will be realigned to allow traffic movement from the existing east side of SH26 to Pleasant Run Road. The scheduled improvements will consist of a concrete roadway throughout the length of the project and construction of a cul-de-sac on the south end of Hidden Oaks Drive. This work also requires modifications to the existing traffic signals at the intersection of Church Street and SH 26, as well as replacement and extension of existing water, sanitary sewer and drainage systems. In order to follow the Master Trails Plan, a 10’ wide trail will also be constructed along the route of the new Church Street improvements. Street Condition Rating: C Street is experiencing minor base failures and surface cracking. Crack sealing is necessary in both concrete and asphalt streets. Repair of existing surface and base failures is necessary. A seal coat or thin asphalt overlay is necessary for extending service life in asphalt pavement. Estimated Project Costs $1,200,000 Project Schedule Design: Spring 2007 Construction: Construction is anticipated to begin in spring 2007 and be complete by fall 2007. Funding Source(s) Project Status Design is 95% complete and right-of-way acquisition and utility relocation efforts are underway. |