Colleyville, Texas City Hall
Bogart Drive & Pleasant Run Road
Project Description
Pleasant Run Road will be reconstructed from Bogart Drive to the south end of the roadway improvements that are currently underway by the Grapevine Colleyville Independent School District. Design is also underway for the proposed widening of Bogart Drive, from Hall Johnson Road to Pleasant Run Road. The new street will be two lanes wide with a third continuous center turn lane. In addition, a roundabout is planned for construction at the intersection of Hall Johnson Road and Bogart Drive. This type of intersection will substantially enhance traffic movement for vehicles in this area.

For more information about roundabouts please visit: http://www.springsgov.com/Page.asp?NavID=6192

Pleasant_Run_and_Bogart.JPG          

Street Condition Rating: F   
Existing concrete and asphalt pavements experience extensive base and sub-grade failures throughout the length of the roadway. Street can no longer maintain proper drainage due to pavement heaving or failure. Existing underground utilities have deteriorated to the point that replacement is required to maintain service life. Total street reconstruction is necessary.

Estimated Project Costs
$1,250,000

Project Schedule
Design:   Spring 2007
Construction:  The improvements on Pleasant Run Road are scheduled for construction in early spring and will be completed well in advance of the opening of the new elementary school. Construction on Bogart Drive is tentatively scheduled for fall 2007. 

Funding Source(s)
50% of the construction is available through the Tarrant County Bond Program. The city's 50% share is from TIF bonds and perimeter street fess.

Project Status
Design is currently underway for Bogart Drive. Bid advertisement has begun for Pleasant Run Road. 




 